Building type: Power Generation Hall
Building size: 1,053m²
Energy Capacity: 101.5 MW
Delivery model: Design & Construct
Date: 2025
Located 540km north-west of Alice Springs, the remote project location created significant logistical challenges, requiring careful planning and coordination to transport materials and deliver the facility efficiently.
The design also needed to support two power stations located 42km apart and connected by a 66kV overhead transmission line, while accommodating additional generation capacity and future energy infrastructure.
Key requirements included:
Working closely with Zenith Energy, AUSPAN designed and manufactured a customised facility engineered around the project’s generation, infrastructure and remote delivery requirements.
The implementation of the Battery Energy Storage System will support cyclic load demands as it operates parallel to existing gas power infrastructure, helping to deliver enhanced efficiency and reduce Zenith Energy’s carbon footprint.
Supported by AUSPAN’s WA design, manufacturing and delivery capabilities, the project was delivered through a coordinated process, preparing the facility for integration of the Battery Energy Storage System and additional gas-fired generation units.
Features:
The completed facility provides Zenith Energy with purpose-built infrastructure to support increased generation capacity and the integration of additional energy technology.
Designed around the specific requirements of the power station, the facility combines durable construction, ventilation and integrated crane infrastructure with the flexibility required to accommodate gas generation and battery energy storage systems.
The result is a long-term infrastructure investment designed to support reliable energy production, increased capacity and future operational requirements.