Building type: Workshop
Building size: 1,775m²
Building height: 18m
Delivery model: Design & Construct
Date: 2025
Piacentini required a workshop capable of housing some of the largest mining vehicles in operation, with sufficient internal clearance, access and lifting capacity for safe and efficient maintenance.
With the facility designed for a project with a defined operational lifespan, it also needed to allow for future dismantling and relocation while meeting a compressed construction timeframe.
Key requirements included:
Drawing on extensive mining infrastructure experience, AUSPAN delivered a customised workshop designed around Piacentini’s heavy equipment maintenance requirements.
Oversized roller shutter doors provide access for large mining vehicles, while high-capacity overhead cranes and generous internal clearances support efficient servicing and maintenance. Full roof and wall insulation help create a more comfortable working environment.
Engineered with future relocation in mind, the workshop combines heavy-duty functionality with the flexibility to be dismantled and reused beyond its initial project.
Features:
The completed workshop provides Piacentini with a high-capacity maintenance facility purpose-built for demanding mining operations. Integrated crane systems, generous clearances and oversized access doors support efficient servicing of large mining equipment.
Designed with long-term flexibility in mind, the workshop can be dismantled and relocated when mining operations are complete, extending the value of the asset beyond a single project.
For Piacentini, the project represents more than a workshop. It is a long-term investment in operational efficiency, fleet maintenance capability and future project flexibility.
Discover other related case studies that might interest you.
Get in touch with our expert team today to discuss strategic solutions tailored to your operations.