The biggest challenge was the very tight timeframe that the project needed to be completed by, and some of the working conditions were also rather challenging.
AUSPAN was able to work closely with WA Kaolin to design a 13,000m2+ de-gritting plant for the processing of more than 100Mt of extremely high-grade kaolin.