CASE STUDY #1106

Industrial Warehouse In Forrestdale

Industrial Building

03 OCTOBER 2022 Case Study # 1106
PROJECT VALUE: $700,000
PROJECT BUILD TIME: 6 Months

CLIENT BRIEF

This client came to us needing help with the design and construct of an industrial building in Forrestdale. The Auspan design team happily provided several different concept design options to choose from based around the client's operational requirements and budget. Auspan was pleased to deliver this project as a complete turnkey package allowing this busy client to sit back and relax until we handed over the keys.

CHALLENGES

AUSPAN SOLUTIONS

FEATURES

  • 625 M2 Floor Area

  • Lunch Room & Ablutions

  • Asphalt Paving & Drainage

  • Concrete Dado Tilt Panel Walls

CLIENT TESTIMONIAL

AUSPANS TESTIMONIAL