“One of the best things about them was that they were really only here for two weeks. They were so quick, very easy to deal with, nothing was too much trouble.”
Ensuring the hospital remained fully operational during construction was a key challenge, achieved with minimal disruption.
AUSPAN collaborated to design an arena that met the unique operational needs of the equine hospital without interrupting service.
“One of the best things about them was that they were really only here for two weeks. They were so quick, very easy to deal with, nothing was too much trouble.”
Discover other related case studies that might interest you.
Get in touch with our expert team today to discuss strategic solutions tailored to your operations.